The Standard tab contains information pertaining to whom and for how long the Asset is loaned.

·
Contact –
The contact the tool is being assigned to.
·
Loan Date –
The date the Asset was loaned.
·
Expected Return
– The date the Assets are expected back.
·
Return Date
– The date the Assets were actually returned.
·
Contact’s Past Due
– Indicates the number of overdue Assets for the selected contact. Tool
assignments that have an expected return date that is past.
·
Use Count –
The number of times the instrument can be used as a standard.
·
Assignment Number
– The reference number created by MET/TEAM when tools are assigned.
·
Assigned Location
– The location the tool is being assigned to.
·
Notes – Any
notes concerning the loan.
Related Topics